Menu

Project Information

Sector
Infrastructure
Architect
The Napper Partnership
Structural Engineer
Arup
Steelwork Contractor
William Hare
Main Contractor
Tarmac Construction
Client
Teeside Development Corporation
Weight
650 Tonnes

Tees Barrage

Sitting atop a concrete barrage this steel bridge was completed by the Westbury subsidiary with steel castings by Blackett Hutton Foundry. The bridge spans 160m and features eight 17.5m arches.